Where it leaks
Car park slab and soffit leak sealing
We stop water coming through suspended car park slabs and soffits, priced by the linear metre and the day, with every compliance and access cost shown as its own line.
- POST-TENSIONED SLAB
- GPR scan + written engineer approval before any drilling
- RESIN
- hydrophobic PU for flow; acrylate gel for diffuse topping paths
- PACKERS
- mechanical 13 mm, 250-400 mm c/c on joints
- PRESSURE
- 35-140 bar working band; engineer-nominated cap on PT elements
- PRODUCTIVITY
- 15-30 lm of joint per crew per day, accessible
- TRAFFIC MANAGEMENT
- $900-$2,500 per day, itemised separately
- AFTER HOURS
- +30% to +100% on labour, itemised separately
A car park deck is the most expensive leak in a strata building to get wrong, and the one most often quoted blind. The work happens overhead, over other people's cars, in a space that has to keep operating, on a slab that may contain steel tendons under enormous tension where a cut tendon is not a recoverable mistake. Every one of those facts is a cost line, and every one of them is a reason to know exactly what is in a quote before a committee accepts it.
We seal construction joints, cold joints, cracks and penetrations in suspended car park slabs and soffits across Brisbane, the Gold Coast and South East Queensland. Programmes run from one joint run over a handful of bays to a full multi-level deck. A crew in accessible conditions covers 15 to 30 linear metres of joint per day. That rate, and not a lump sum, is what a deck programme should be built from, and it is the first thing to check in any quote you are holding.
This page carries the numbers we work to, the compliance gate we will not step around, and the three car park leaks we will tell a committee not to inject at all. If your soffit has rust staining and drummy concrete tracking along the crack line, a waterproofer sealing it is the last thing you want.
If you want the method itself rather than this particular situation, start with how concrete crack injection works.
What the drips, the stalactites and the rust stains are actually telling you
Nearly every car park enquiry starts with the same sentence: water is dripping onto the cars. What matters is not the drip, it is what is around it. The soffit of a suspended deck records its own history, and it is usually readable before anyone gets a scissor lift out.
Read the whole level before pricing any of it. On a deck with a separate topping slab, water enters at one point and exits metres away, which means mapping is worth more than injecting. A quote written off one visit to one wet bay is a quote for the wrong length of joint.
| What you can see | What it usually means | What it changes |
|---|---|---|
| Clear drip from a straight line in the soffit | A construction or cold joint that never bonded. This is the commonest leak path in a suspended deck | Injectable. Budget on joint metres at 250-400 mm packer centres, not on a count of cracks |
| Calcite stalactite hanging below the slab | Chronic flow. Water has moved through that path long enough to dissolve lime out of the concrete and redeposit it below | Not a new defect. Expect a longer joint run than the drip suggests, and expect calcite inside the joint that has to be flushed out before resin will travel |
| Rust staining with drummy, hollow-sounding concrete along the crack | Chloride-driven reinforcement corrosion, commonly called concrete cancer | Stop. This is a concrete repair scope, not an injection scope. Sealing it hides steel that keeps expanding |
| White efflorescence tracking along a line, no active drip | Water has been moving through and evaporating, leaving dissolved salts behind | Proof of a path, not proof it is dry. Inspect in the wet season when you can see flow, not in September when it has dried off |
| Wet patch metres from any visible crack, deck has a topping | Water entering the topping at one point and exiting through the weakest point in the structural slab below | A mapping job before an injection job. Injecting where the drip is will seal a joint that is not the source |
| Ponding on the deck above with no fall to a drain | A surface drainage, fall or joint sealant problem | Sealing the soffit treats the symptom only. Correct the fall or the deck joints or you will be back |
Before anyone drills: is this deck post-tensioned?
A post-tensioned slab contains steel tendons that were tensioned after the concrete cured and are still under enormous load. They are common in car park decks and apartment slabs built from the 1980s onward. Drilling into one without scanning can cut a tendon, and that is not a mistake anybody recovers from: it is a violent release of energy, an immediate structural issue, and an insurance event.
The controls are simple and they are not negotiable. Ground-penetrating radar over every drill position, tendons and reinforcement marked on the soffit, and written approval from a structural engineer before a bit touches concrete. The same engineer should nominate a maximum injection pressure in writing, because on a prestressed element the governing limit is the structure, not what the pump can produce.
A scan with moisture readings, crack monitoring where needed and a written diagnosis sits at $450 to $1,500 as its own line. On a post-tensioned deck it is not an optional extra you can decline to save money, and any contractor willing to skip it is telling you something about how they will do the rest of the job.
Where the structural drawings have been lost, which is common in buildings that have changed managing agents more than once, the deck is treated as post-tensioned until proven otherwise. Nobody's recollection is evidence.
Structural slab or topping? Map it before you inject
Most car park decks are not one slab. There is a structural slab that carries load, and above it a topping or screed that carries the fall to the drains, sometimes with a membrane between them. Water gets into the gap between the two, travels sideways along it until it finds a defect in the structural slab, and comes out there. That is why the wet bay and the leaking bay are frequently not the same bay.
Mapping is the difference between a programme that works and one that seals a joint and moves the leak three bays over. It costs a fraction of the injection and it is the step cheap quotes leave out, because it is the only step that produces no visible progress.
- Get the as-built structural drawings from the body corporate records and confirm slab thickness, topping thickness and the joint set-out, so packer offsets can be calculated rather than guessed.
- Correlate the drip lines on the soffit with the joint set-out above. Joints run in straight lines and so do their leaks. A drip on a curve is usually a crack, a drip on a line is usually a joint.
- Scan for thickness and reinforcement at each intended drill position, which also confirms whether you are drilling into the structural slab or only into the topping.
- Water-test or dye-test on the deck above at suspected entry points, and inspect during or immediately after rain if the season allows.
- Check the deck surface: drainage falls, ponding, failed joint sealant and cracked topping. If the water is arriving because the deck above cannot shed it, injecting the soffit is treating the symptom.
Three car park leaks we will tell you not to inject
Injection is very good at one thing: sealing a defined path through concrete. It is genuinely poor at everything else, and in a car park there are three situations where the honest answer costs us the job and saves the committee a great deal of money.
- Chloride-induced corrosion, not a water pathCracking that follows the line of the reinforcement, with rust staining, spalling or drummy concrete, is steel expanding as it corrodes. Rust occupies more volume than the steel it came from, so it pushes the cover off. Sealing that crack traps the problem behind resin while the steel keeps expanding, and in two or three years there is more spalling and a harder repair. The correct scope is concrete repair: break out to sound concrete behind the bar, clean or replace the steel, apply a passivating primer, reinstate with a compatible repair mortar, and on a large deck consider cathodic protection or a migrating corrosion inhibitor. That is a different trade licence class, a different programme and a different budget, and we hand it over rather than paper over it.
- A designed movement jointExpansion and control joints in a deck are built to move. Filling one with resin defeats its purpose and transfers the movement into the concrete beside it, which then cracks. The repair is joint preparation, correct backing rod and a movement-capable sealant, quoted per linear metre as a sealant scope. An injection contractor who cannot tell a movement joint from a cold joint on your deck should not be drilling it.
- A failed deck membrane or a deck that cannot shed waterWhere the trafficable membrane above has debonded, blistered or reached end of life across an area, injection seals the paths water is using today and water finds the next ones. That typically buys 6 to 18 months. The correct answer is membrane removal and replacement to AS 4654.1 and AS 4654.2, with the falls corrected. Injection has a legitimate role there as staged protection for the level below while the deck programme is funded, but it should be sold as exactly that, in writing, with a stated expected life.
- Broad-area seepage through the slab bodyIf water is coming through the concrete across an area rather than along a line, there is nothing for injection to grip. That is a coating, tanking or drainage question. Pumping resin into porous concrete produces a quote, a mess and no result.
How we seal a soffit joint on a deck that is still being used
- Mark the run before the drill comes outChalk the full joint run, not just the wet section, and mark every packer position. Scan each marked position. On a deck where the drawings are missing, this is where the programme either gets safe or gets dangerous.
- Drill at 45 degrees, into the joint, never through it13 mm holes at 45 degrees to the soffit, alternating either side of the joint line, offset from it by roughly half the element thickness so the hole meets the joint at mid-depth. On a 250 mm slab that is an offset of about 125 mm. Drill to two-thirds to three-quarters of the slab thickness and never break through the far face. On a soffit, breaking through means resin into the bay above.
- Mechanical packers at 250 to 400 mm centresJoints are wider and better connected than cracks, so they take more resin and closer packers. As a working rule, spacing should not exceed the thickness of the element. Mechanical packers seal inside the slab and take working pressure; surface ports glued to a wet soffit will not adhere and will blow off.
- Water-flush every packer before injectingFlushing proves the joint is hydraulically connected from one packer to the next, and it clears the laitance and calcite that would otherwise stop resin dead. If water pumped into one packer does not appear at the next, the set-out is wrong or the joint is not continuous, and that is far better to learn with water than with resin.
- Kill any single gusher first, then work the joint in sequenceA running point is dosed with a fast-gel hydrophobic polyurethane, accelerated at roughly 1 to 10 per cent by volume to give anything from about 20 seconds to several minutes of gel time. Once the flow is down, the joint is injected consistently from one end to the other rather than jumping to wherever the drip is loudest.
- Start low on pressure and watch the structure35 to 140 bar is the normal working band for mechanical-packer polyurethane, but the limit is the slab, not the pump, and on a prestressed deck it is whatever the engineer nominated. Over-pressure announces itself: the joint visibly opening, resin appearing somewhere unexpected, spalling around a packer, or a sudden pressure drop with no resin return.
- 24 hours, then cut back and make goodPackers stay in place a minimum of 24 hours. They are then cut 10 to 20 mm below the surface, the recess filled with a non-shrink hydraulic plug and ground flush. Any resin bleed is ground off the soffit, because nothing will bond to cured polyurethane afterwards. On a deck programme this is nearly always a second visit, and it should appear in the programme rather than being discovered at the end.
What 15 to 30 linear metres a day means for your deck
A crew in accessible conditions seals 15 to 30 linear metres of joint per day. Off a scissor lift, working overhead, with traffic management running and bays being cleared and released around you, the real rate lands at the bottom of that band or below it. That single number lets a committee sanity-check any deck quote before it goes to a vote.
Take a mapped programme of 180 linear metres of soffit joint. At 15 to 30 metres a day that is 6 to 12 crew days of injection, plus mobilisation, plus a return visit for cut-back and make good, plus the days lost to staging if only two bays can be closed at a time. If a quote in front of you implies 60 metres a day, either it is not using mechanical packers, or the metres are wrong.
Access equipment runs $450 to $1,600 per day delivered, with a scissor lift at the cheap end and a knuckle boom at the dear end. Headroom in a car park frequently rules out the machine you would prefer, which is worth confirming on site before it is priced.
Staging is a genuine trade-off and it belongs to the committee, not to us. Closing more of the deck at once shortens the programme and reduces the number of traffic management days. Closing less keeps residents parked but stretches the job, and the daily costs run for longer. We price both when a committee asks, because the cheaper answer is not always the one that inconveniences fewer people.
The lines other quotes bury
Traffic management is frequently the largest single line on a car park deck quote, and a lump-sum quote lets a contractor hide it, absorb it, or produce it later as a variation. Every one of these appears separately on our quotes so a committee can see what it is buying and can compare three tenders against each other line by line.
These are indicative South East Queensland rates, published so you can hold any quote against them. They are not a quote, and long repetitive runs on a single deck genuinely price below the bands shown because the crew stops setting up and starts producing.
| Line item | Indicative rate | Why it is separate |
|---|---|---|
| Site attendance minimum, business hours, metro | $450 - $900 | Travel, set-up, plant on the truck and a minimum block of labour. No legitimate contractor attends, sets up a pump, injects and makes good below this |
| Construction and cold joint injection | $200 - $500 per lm | Joints are wide, connected and take more resin than a crack, at closer packer centres |
| Crack injection, accessible | $150 - $450 per lm | Long repetitive runs on one deck trend toward $80 - $200 per lm. A short isolated crack prices as a minimum job, not at a rate |
| Individual packer, installed and injected | $35 - $95 each | So discrete defects and variations are priced at a known rate instead of becoming a renegotiation |
| Scissor lift or EWP, delivered | $450 - $1,600 per day | Soffit work is overhead work. Headroom often dictates the machine and therefore the rate |
| Certified traffic management | $900 - $2,500 per day | A compliance requirement on most operating car parks and frequently the largest single line on the quote |
| After hours, night or weekend | +30% to +100% on labour | Time-and-a-half evenings and Saturdays, double time Sundays and nights, plus supervision, security escort and induction time |
| GPR scan, moisture readings and written diagnosis | $450 - $1,500 | Mandatory on a post-tensioned or unknown deck. This is the line that prevents the unrecoverable mistake |
| Make good and reinstatement | Quoted per item | Cutting back, plugging and grinding flush is included. Re-coating a soffit or reinstating line marking is not, and we say so up front rather than finding it at the end |
One drip of resin on a bonnet costs more than the job
Cured polyurethane does not come off duco. It has to be ground or cut away, which on a car means a panel and a respray, and the conversation that follows it is not one any committee wants in the minutes. Everything about how we set up a deck is built around that fact.
Bays under and adjacent to a work zone are cleared and signed, not just coned. Residents get notice with dates and bay numbers, and a bay that cannot be cleared is a bay we do not work over that day. Drip containment goes under every packer position, surfaces are masked before injection rather than cleaned after it, and the crew carries the means to stop work in under a minute if a vehicle appears where it should not be.
The same discipline applies to the crew. A basement is an enclosed space where nothing disperses. Drilling concrete releases respirable crystalline silica, with an Australian workplace exposure standard of 0.05 mg per cubic metre over an eight-hour period, so drilling runs with on-tool extraction or wet, not with a broom afterwards. Uncured polyurethane contains isocyanates, which are respiratory sensitisers with an exposure standard of 0.02 mg per cubic metre as an eight-hour average, and sensitisation is permanent. That means fit-tested respiratory protection and forced ventilation in an enclosed basement, and safety data sheets available on site for every product. A building manager is entitled to ask for those sheets, and should.
What the committee gets at the end
Injection is invisible once the packers are cut off, so the record is the deliverable. Ours goes to the body corporate, not just to the building manager's inbox, because the committee that funded it is the party that will need it in three years.
The handover pack contains photographs before and after, taken from the same positions, a written description of what we found and what we did, moisture meter readings at marked points before and after, and the observation period result. We observe for a minimum of 24 to 48 hours and through a rain event wherever the season allows, because a dry deck in October proves nothing.
There is an honest limit to what any of that warrants, and it should be stated plainly before the work rather than argued afterwards. Sealing from the dry side redirects water, it does not remove it. A warranty on injection covers the joint or crack we sealed. It cannot cover a new path opening somewhere else, because the water is still there and still under head. The value of the before and after photographs and the written description is that when something reappears, it takes minutes rather than a dispute to establish whether it is our repair or a new source, and if it is our repair we come back.
What it costs
Typical strata car park deck programme
$20,000 - $150,000+
A deck is priced by the metre and by the day, not as a lump sum. This band spans one bay of soffit joints through to a full multi-level deck with traffic management and after-hours access. The auditable numbers are the unit rates in the table above, and those are what a committee should be comparing between tenders.
Indicative only, and excluding GST. Build a line-by-line estimate for your own job with the price book, or read the working behind the rates in the 2026 cost guide.
Questions we actually get asked
- How do we find out whether our car park deck is post-tensioned?
- Start with the structural drawings, which the body corporate should hold in its records and the managing agent can retrieve. On the building itself, post-tensioned slabs usually carry stamped anchor plates or patched anchor pockets along the slab edge, often in a regular line. If the drawings cannot be found, which is common in buildings that have changed agents, the answer is a ground-penetrating radar scan over the intended drill zone and the assumption that the deck is post-tensioned until the scan proves otherwise. A maintenance contractor's recollection is not evidence and no one should drill on it.
- Can the car park stay open while you work?
- Usually yes, in stages. A typical programme closes two to four bays at a time behind certified traffic management, works that zone, then releases it and moves on. The trade-off is real: staging keeps residents parked but stretches the programme, and traffic management is charged per day at $900 to $2,500, so a longer programme costs more in daily rates. We price both a staged and a full-level closure when a committee asks, so the disruption decision is made with the numbers in front of it rather than after.
- There are stalactites hanging off our ceiling. How long has this been leaking?
- Longer than the drip suggests. Calcite forms when water carrying dissolved lime from inside the concrete emerges and evaporates, and building a visible stalactite takes months to years of steady flow. Two things follow. The joint has probably been leaking through more than one wet season, so the run to be sealed is usually longer than the wet section anybody points at. And the joint itself will be partly blocked with the same deposits, which is why every packer gets water-flushed before resin goes anywhere near it.
- Our last contractor sealed the soffit and it came back two bays away. Was that a failed repair?
- It may not have been. Sealing from the dry side redirects water rather than removing it, so a genuinely successful repair on one joint can push water along to the next weakest point. The way to tell is the record. Ask the previous contractor for their photographs and a written description of which run they treated. If the new leak is on the run they treated, that is a repair issue and it is theirs. If it is on a joint they never touched, it is a new path and a new scope. If they cannot tell you what they treated at all, you have learned something else worth knowing before you engage them again.
- Why is night work 30 to 100 per cent dearer, and is it ever worth it?
- The loading follows standard Australian trade penalty structures: roughly time-and-a-half for evenings and Saturdays, double time for Sundays and nights, plus supervision, security escort and induction time that daytime work does not need. It is worth it more often than people expect. Night work on a commercial car park can remove several days of traffic management at $900 to $2,500 each, avoid clearing bays that tenants are actively using, and shorten the total programme. We quote it both ways on any deck where daytime access is genuinely constrained, because occasionally the after-hours version is the cheaper of the two.
- Our quote just says crack injection, car park, and a number. Is that enough to put to an AGM?
- No, and it is not enough to compare against another quote either. A deck scope should state the mapped length of joint and crack in linear metres, the packer type and spacing, whether the deck is post-tensioned and who is paying for the scan and the engineer's approval, whether traffic management and after-hours loadings are inside or outside the number, what make good covers, and the observation and documentation you receive at the end. Three quotes written that way are comparable. Three lump sums are not, and the cheapest lump sum is almost always the one with the fewest of those items inside it.
Job library
We publish real car park leak sealing jobs with the actual numbers — linear metres, days on site, what it cost, and how the repair was holding up after the next wet season. The library is being built from documented jobs rather than filled with stock photographs. Ask us for references for your specific situation in the meantime.
Related work
- Construction JointsSealing the leaking joint lines between concrete pours in basements, car parks and tank walls, using drilled mechanical packers at 200 to 400 mm centres rather than treating a joint as if it were a crack.
- Leaking basementBelow-ground leak sealing for strata and commercial buildings, where the water path is usually the joint at the base of the wall rather than the crack you can see.
- Strata & Body CorporateCrack and joint leak sealing on common property, written for the people who have to scope it, price it, get it approved at a meeting and explain it to residents.
- Lift Pit WaterproofingWe dewater, degrease, seal and where necessary tank leaking lift pits, under a confined space permit, with the lift isolated and locked out by your lift contractor.
- Negative SideWhat negative side waterproofing is, why sealing from the dry side redirects water rather than removing it, where the Australian standards actually sit, and what Queensland law requires to be in writing before the work starts.
- Crack InjectionConcrete crack injection fills a leaking crack or joint right through the thickness of the concrete with resin, worked from the dry side without excavating anything.
Worth reading first
- Fifteen times we'll tell you not to injectThe fifteen situations where crack injection is the wrong repair, what the real problem is in each one, and which trade you should be calling instead.
- What crack injection actually costs in AustraliaA published, itemised price guide for concrete crack injection and leak sealing in Australia, showing the rate card, the reason competing quotes never agree, and three jobs costed line by line.
- How to scope and tender a water ingress repairA scope-of-works template a body corporate committee can copy, plus how to normalise competing quotes, structure the AGM cost paper, and decide when a special levy is actually required.
- Does it actually work, and for how long?An honest account of when injection is a permanent repair, the three ways it fails, and a step-by-step test for working out whether a repair that leaked again was the contractor's fault or a new problem.
Not sure this is your problem? Here are fifteen times we tell people not to inject
Send us a photo and we'll tell you what it is